[1]
Arellano Escobar, K., Andrade Valles, A.I.A., Castillo Campoverde, T.O. and Herrera, R.F. 2021. Assessment of BIM use in the early stages of implementation. Revista Ingeniería de Construcción. 36, 3 (Dec. 2021), 311–321. DOI:https://doi.org/10.7764/ric.00005.21.